Regulatory analysis, market intelligence, and technical reference materials for pipeline construction documentation and compliance.

The Structural Argument

Why the same failures happen everywhere.

Duplicate weld IDs, fabricated heat numbers, uncirculated procedures, job books that answer nothing — found at different operators, on different projects, in different parts of the country. The public enforcement record matches them decade after decade. That is not bad hiring: it is the structure of the delivery ecosystem.

Read the structural argument
Evidence

Field Findings

Five anonymized findings from real records reviews, corroborated by public enforcement.

Field Findings #1

The Duplicate Weld IDs

Nearly a third of weld identifiers appeared more than once across multiple years of complete project files.

Poor Records
Read the finding
Field Findings #2

The Fabricated Heat Numbers

One heat number on most of a fabrication's components — including every fitting. Physically implausible, on an asset already in service.

False Records
Read the finding
Field Findings #3

The Procedure Nobody Sent

Sound welds, made in good faith, under a procedure that didn't cover the diameter being welded. The fix already existed — it was never distributed.

Undistributed Records
Read the finding
Field Findings #4

The Job Book That Answered Nothing

A well connect gated on an MAOP uprate; records that couldn't verify something as basic as flange class. A book that answers nothing is worse than no book.

Hollow Records
Read the finding
Field Findings #5

The Wrong Grade of Steel

Pipelines derated or replaced because the material in the ground was a lower grade than the design called for. The root isn't the steel — it's the work the steel generates across the entire supply chain.

Material Mismatch
Read the finding
Engagements

Case Studies

What construction records are for, and what happens when they are tested.

Ownership Transition

When the owner changed, the records didn't have to.

Read the case study
Closeout Reconstruction

Rebuilding the evidence after the fact.

Read the case study
Regulated Utility Records

Stabilizing legacy records under a regulator's eye.

Read the case study
Systems Implementation

Process discipline beyond the pipeline.

Read the case study
Specification Development

Fixing the requirements before the records exist.

Read the case study
Enforcement

Regulatory Intelligence

What regulators check across PUCO, PAPUC, WV PSC, and PHMSA — and where operators fail.

Enforcement Across the States

Ohio (PUCO), Pennsylvania (PAPUC), West Virginia (WV PSC), and federal PHMSA enforcement in one analysis: record-keeping fines, capital-program scale, rising penalty caps, and what all of it requires of construction documentation under 49 CFR Part 192.

Read the analysis

Construction Records Compliance

What a pipeline construction record has to prove under 49 CFR Part 192: the six evidence chains that must close, the failures that recur in post-construction reviews, and how a defensible records program is designed.

Read the guide
Process in Tandem

Our process and MPS-JobBook, working as one system

The software does not run the engagement. MPS engineers and inspectors own the decisions and the review. MPS-JobBook holds the standard each record is judged against, validates it, and keeps the trail.

  1. 01

    Intake & Applicability

    Pre-engagement
    MPS — what we do

    We scope the work, name the governing standard, and decide which requirements apply.

    MPS-JobBook — what the system does

    Holds the applicability profile and generates the requirement set that defines complete.

  2. 02

    Design & Readiness

    Gate 1
    MPS — what we do

    We review procedures, WPS/PQRs, and qualifications before work starts.

    MPS-JobBook — what the system does

    Tests procedure and welder coverage against planned sizes, thicknesses, and joint types.

  3. 03

    Pre-Construction

    Gate 2
    MPS — what we do

    We verify materials on arrival: certificates, coating systems, heat-number traceability.

    MPS-JobBook — what the system does

    Matches heat numbers to certificates and checks attributes against project requirements.

  4. 04

    Parallel Construction

    Gate 3
    MPS — what we do

    Inspectors capture documentation where the work happens and resolve conflicts at the source. Drone and sensor data enters the same way.

    MPS-JobBook — what the system does

    Validates entries as captured, links weld, NDE, and coating records to the joint, and raises discrepancies instead of storing them.

  5. 05

    Segment Readiness

    Gate 4
    MPS — what we do

    We confirm a segment's records are closed before backfill, testing, or turnover.

    MPS-JobBook — what the system does

    Checks segment completeness: welds matched to NDE, coating and test evidence linked.

  6. 06

    Final Closeout

    Gate 5
    MPS — what we do

    We review 100% of the documentation, log every exception, and deliver a report that follows the evidence.

    MPS-JobBook — what the system does

    Reconciles the record set and produces the evidence-linked closeout package.

See how the five gates work in the platform
Executive briefing

Put the evidence in front of the decision-makers

Discuss the record evidence, exposure, and next decision with our implementation team.

Request a briefing through our implementation partner →